Group 3, Week #7 Topics
 
Announcements and Other Stuff
The distribution of tape measures and wire strippers began this week.
 
Follow up on 6⁄16 issues: Nitrogen flushed my recovery equipment. Changed vacuum pump oil. Nitrogen flushed and triple evacuated appliance. I had an HVAC job to complete Monday 6⁄18 so I tested my equipment by completing the work we started Saturday. Appliance is now operational and dehumidifing my home. 
 
It would be helpful if you reviewed the following before or after class
Checking small appliance relays and overloads (see the Additional Resources section and textbook pages 368-369)
 
Planned In Class Reviews, Lectures, and Exams
ESCO EPA 608 Type II lecture (pages 8-10)
Heat exchangers
Service valve positions
In class EPA Section 608 Core and Type I review
ESCO EPA Section 608 Core and Type I exam
EPA 608 Type II practice exam Saturday 6⁄30
 
Lab Work
Diagnosed and repaired an actual defective relay in a Type I appliance
Air handler flue and gas piping
Connecting flue piping, connecting gas piping
Checking for cracked heat exchangers
Attaching gauges & checking refrigerant charge using superheat  (see textbook pages 236-238)
 
Back

Copyright 2018 Stanley Bryant. All rights reserved.